Skip to content

M6-S2 — Capstone II: the builder’s review, and your sign-off

Section titled “M6-S2 — Capstone II: the builder’s review, and your sign-off”
ModuleM6 — Capstone
After this session you canRead a specification until a builder could start without a question, fix your own the same way, and walk into your sign-off knowing what it asks.
TimeFacilitated: 33 min · On your own: 23 min
Before you startYour binder at version 1.1 (M6-S1). The readiness checklist, the change-request job aid and the capstone rubric.
Your binderSo far: BRD 1.1, PDD 1.1, blueprint 1.1, the matrix and the CR register, all on version 1.1. This session adds: review notes, the fixes they lead to, and your score against the rubric.
Go deeperChange an entity safely · Reports

◆ Orientation (1 min) — Read it as the builder will

Section titled “◆ Orientation (1 min) — Read it as the builder will”

Rania Saleh was in none of your interviews. Next week she opens your binder and builds Release 1 from it, then Release 2 with CR-01. Every line she has to guess is a line she may build wrong, and every question she has to ask you costs a day. Before anyone signs your work off, you read it once more with her eyes: first someone else’s blueprint, then your own binder.

▤ Concept (3 min) — What the sign-off asks: a change request alone, and the rubric

Section titled “▤ Concept (3 min) — What the sign-off asks: a change request alone, and the rubric”

Your certification is decided in an assessment event outside the 16 contact hours. It has three parts:

PartTimeWhat you do
Knowledge test60 minQuestions in the style of this course’s practice items, on new cases.
A change request, alone70 minA message you have not seen, handed out at the event, arrives after version 1.1. You take it through all four steps on your own binder, end to end, with no coaching.
Sign-off with a reviewer30 minA reviewer reads your binder against the capstone rubric and asks the builder’s questions.

The change request is the course’s thread, done once more without help. You have done every step before with CR-01: detect it in a message, identify what it touches through the matrix, define the problem behind it and its options, then size them and recommend one for its owner to decide. Your CR-01 trail is your worked example, and the change-request job aid has the four steps and the form on one page. The brief and the rubric are on the assessment page; every rubric row says, in a sentence or two, what “pass” looks like.

At the sign-off, expect the reviewer to pick lines and ask you to trace them: from a requirement to its design and its criteria, or from a blueprint element back to the requirement that justifies it. If you can show both directions in a minute, your matrix is doing its job.

So prepare in three ways: read your binder as a builder, in the discussion below; score it against every rubric row before you book the event; and try the practice questions on the assessment page.

◇ Worked scenario (3 min) — Seven defects in someone else’s blueprint

Section titled “◇ Worked scenario (3 min) — Seven defects in someone else’s blueprint”

An excerpt from a blueprint for Equipment Loans in another company. Find the defects first.

B2. Loans: Item (Reference, required); Borrower (User, required); Returned on (Date, required); Loan status (Category: Out, Returned). B7. IT approval: owner User, Fixed, Omar Faris. Actions: Approve → Next Step; Return (so the borrower’s manager can look again). B9. “When a loan is approved, email the borrower”: event On Entry Updated. B11. Report All loans, 9 columns, PDF, for the IT manager to read on her phone. B11. Loans per person: an Aggregate Entity grouping loans by borrower. B12. Staff: Edit on Loans.

  1. Returned on is required, but nobody knows it when the loan starts. Optional on the entity, Mandatory at the return step.
  2. A fixed owner, no plan for absence. Omar on leave stops every loan. Add Enable Reassign, or a group with Take Ownership and a fallback, and say in the blueprint who covers for him.
  3. Return goes to the first step, the borrower, not the manager in between. If “look again” means the step before, set the target to Previous Step.
  4. On Entry Updated never fires for an approval: moving between steps is not an update. Use On Workflow Step Exited by Approve.
  5. Nine PDF columns, on a phone. A PDF prints 7 columns and reports open on the web only. Cut the columns or send Excel, and give her a chart she can read on the phone.
  6. An aggregate for a count. “Loans per person” is a summary grouped by Borrower.
  7. An access level in a blueprint. “Edit” is the administrator’s decision. Write the intent: what staff see and change, at which step.

The habit to copy: on every line, ask “what would the builder have to guess, and what would break?” The readiness checklist is that question, written out.

✳ Discussion (20 min) — The builder’s review of your binder

Section titled “✳ Discussion (20 min) — The builder’s review of your binder”

With a facilitator. Swap binders with a partner: BRD 1.1, PDD 1.1, blueprint 1.1, the matrix and the CR register. Read your partner’s with the readiness checklist as if you had to build it tomorrow, and write down the three questions you would have to ask its author, one defect, and one thing done particularly well, each with its section number (9 min). Give each other the notes; answer each question in the document, not aloud, and agree the fixes (6 min). Two pairs tell the room the most useful question they were asked (5 min).

On your own. Put your binder away for at least an hour. Then read it as Rania would, with the readiness checklist: write the three questions she would ask you, one defect and one strength, each with its section number (5 min). Answer the questions in the documents and fix the defect. Then score each row of the capstone rubric, pass or not yet, and note the line that proves it (5 min). Compare your notes with the model answer.

Model answer

Useful review notes (from a review of a learner’s version 1.1)

  • Question: “B8: a ticket from a Priority clinic whose contact left Customer account empty gets 4 hours. Is that what Mariam signed?” (It is: risk R-7 and AC-NF03d record it. The author added a pointer from B8 to R-7, so the builder does not “fix” it.)
  • Question: “B12 hand-off list: are account managers a group, or named people on the view? Tariq needs to know which to set up.” (The author chose the group Account Managers and said so.)
  • Question: “C4 says nothing is expensive for stored records. Release 1 will be live when Release 2 is built; do Release 1 tickets lose anything when the Help Desk limit changes its method?” (A real question for the builder: the author recorded it as an open question for Rania.)
  • Defect: “Matrix row P1b has no Changed by entry, but its tier now sets the desk’s limit. A later change to P1b would miss CR-01.” Fixed: CR-01 added to P1b.
  • Strength: “Every CR-01 line in blueprint 1.1 is marked, so Rania can build the change on its own and the tester can find its criteria from C4.”

Notes like these are specific (a section number), answerable, and aimed at what the builder would have to guess. “Looks good” and “add more detail” help nobody.

✓ Practice (4 min) — Check your understanding

Section titled “✓ Practice (4 min) — Check your understanding”
PracticeChoose one answer.

Which review note is most useful to the author?

  1. Explanation for A

    ✗ Incorrect

    Not this one: it points at an area, but the author still cannot tell what is missing or why. See the model review notes.

  2. Explanation for B

    ✓ Correct

    Correct: it names the section, the gap and the question the builder would otherwise ask. See the model review notes.

  3. Explanation for C

    ✗ Incorrect

    Not this one: a preference without a reason or a defect gives the author nothing to act on. See the model review notes.

Check your answer

The correct answer is B. Open the explanation under each option to see why.

PracticeChoose one answer.

Your partner asks: “B8: what limit does a ticket get when it has no account?” Where does your answer go?

  1. Explanation for A

    ✗ Incorrect

    Not this one: a value the builder has to discover is a guess, and the readiness checklist exists to remove guesses. See the worked scenario.

  2. Explanation for B

    ✗ Incorrect

    Not this one: the builder will meet the same question later and will not have your reply. See The builder’s review.

  3. Explanation for C

    ✓ Correct

    Correct: the builder reads the document, not your conversation, so the answer must live in it. See The builder’s review.

Check your answer

The correct answer is C. Open the explanation under each option to see why.

PracticeChoose one answer.

Your partner finds that your blueprint 1.1 also gives representatives a Priority filter on their list. Neither CR-01’s options nor decision D-13 mention it. What is it?

  1. Explanation for A

    ✗ Incorrect

    Not this one: only what the owner decided goes into 1.1; good intentions are not a decision. See Step 4 of a change request.

  2. Explanation for B

    ✓ Correct

    Correct: an element no decision and no requirement justify fails the backward check after the baseline. See The two checks.

  3. Explanation for C

    ✗ Incorrect

    Not this one: a defect is a requirement the build does not meet; here the document adds one nobody asked for. See Step 4 of a change request.

Check your answer

The correct answer is B. Open the explanation under each option to see why.

↺ Recap (2 min) — Your binder now: the hand-in

Section titled “↺ Recap (2 min) — Your binder now: the hand-in”

Your binder now (Part 6, the hand-in). Tick each line before you book the assessment event.

  • BRD 1.1, PDD 1.1, blueprint 1.1, the matrix and the CR register, all on version 1.1.
  • Every section passes its rubric row on your own score, with the line that proves it.
  • The builder’s questions from your review are answered in the documents.

Bring the binder to the assessment event as you would hand it to Rania: every document on its version, every change in the change log, nothing that only you can explain. Your change request on the day is written into that same binder, as its next change.

After Module 6 you can hand over a complete, reviewed specification: a BRD a sponsor can decide on, sub-documents that define the largest process and trace every requirement, a blueprint a builder can follow without questions, and the criteria that prove when it is done; and you can take a change into it without breaking it.

That is the whole of ACA. You started with a charter and a sponsor’s memo. You leave with a signed baseline, a decided change and version 1.1 of the documents that turn them into a working system, written in the business’s words and in the platform’s, tied together line by line.

What comes next. On the Analyst path, ACE (Certified Expert) builds on this course: you will design multi-module architectures and advanced automation, and build them. ACE expects you to build, so if you hold ACA only, you first take the build modules of the sibling Level 2 course for builders as self-paced prework. ACE’s own page lists them.