The structure of the document you build up during this course: one binder, three parts. Each section says in which part of the course you write it and in which version of the binder it first appears. Copy the headings into your own document and keep the section numbers, because the traceability matrix refers to them.

Each document keeps its own version number.

DocumentVersionsWhat they mean
BRD (Part A)0.1 in Part 0 · 1.0 at the end of Part 1 · 1.1 in Part 60.1: the binder is open. 1.0: signed by the sponsor; this is the baseline, and from now on anything that would change it is a change request. 1.1: the first approved change request is in.
Process definition (a sub-document of A6 and A7)0.1 in Part 1 · 1.0 in Part 3 · 1.1 in Part 60.1: the process as it runs today. 1.0: the future process, its rules, exceptions, escalation and controls, approved by the process owner. 1.1: the change request’s effects.
Blueprint (Part B)0.3 in Part 2 · 0.6 in Part 3 · 0.9 in Part 4 · 1.0 in Part 5 · 1.1 in Part 6It grows section by section; 1.0 when acceptance is complete and every requirement is traced.

Work done after the baseline that adds detail without contradicting the BRD (the blueprint, the future process, the answer to a question the BRD left open) is elaboration, not change. Anything that makes the system do something the BRD does not say, or say it differently, is a change request.

The business’s words only. No option names, no field types.

No.SectionWhat it holdsWritten inVersion
A0Document controlTitle, version, date, author, reviewers, approvals with dates, change log, the list of sub-documentsPart 00.1
A1Business needThe problem today, who has it, what it costs; the decision asked of the readerPart 00.1
A2SummaryThe need and the solution in two sentences; written last, kept shortPart 61.1
A3Objectives and success measuresMeasurable objectives: what changes, for whom, by how much, checked how; missing figures as open questionsM1-S11.0
A4ScopeIn scope, out of scope, later (phases); assumptions and constraints; every “not available” with its workaroundM1-S11.0
A5Stakeholders and usersWho uses, runs, pays for and is affected by the system; what each needs; who approves whatM1-S1, M1-S21.0
A6Current processThe process as it runs today, in short, with each pain point and the requirement that removes it; the map is in the process definition (version 0.1)M1-S21.0
A7Future processAt 1.0: how the business will work, in a few numbered sentences. From Part 3: the to-be maps, in the process definition (largest process) and here (the others)M1-S2, then M3-S21.0, detailed later
A8Requirements registerID · requirement · functional or not · source · priority · reasonM1-S21.0
A9User storiesFor the Release 1 Must requirements that a person does: “As a … I want … so that …”; a story takes its requirement’s number; acceptance criteria are added in C1M1-S21.0
A10RisksWhat could stop the system meeting its objectivesM1-S2, M3-S11.0
A11Open questions and decisionsEach question with the person who answers it and the answer once given; each decision with who made it and whenM1-S2 onward1.0
Sub-documentWhat it holdsWritten in
Process definition (one per large process)Purpose and scope; the process at a glance; roles; the current process (map and steps); the future process (map and steps, each naming its requirement and the workflow step that carries it); business rules; exceptions and escalation; measures; controls; open points; change historyCurrent process in Part 1; the rest in Part 3
Process mapsSwimlane maps: a lane per role; start and end; task; decision; hand-off; waitParts 1 and 3
Traceability matrix (C2)See the traceability job aidFrom Part 1
Change-request register and forms (C3)See the change-request job aidFrom Part 1

The platform’s words. Every row names the requirement IDs it meets.

No.SectionWhat it holdsWritten in
B1Module and entitiesWhich module; the entity list; why each is an entityM2-S1
B2Entity dictionariesPer entity: field · type · required · default · filled in by · requirement · note; main and sub titleM2-S1
B3Status modelsPer status field: value · meaning · set by · whenM2-S1
B4ProtectionSensitive or Encrypt, who may see, and the costM2-S1
B5LinksMap; relations table; mapped fields with Update Mode and reason; virtual entitiesM2-S2
B6Front doorsService cards; which requests use a view’s form, and whyM3-S1
B7WorkflowsSteps; owners and fallbacks; actions and targets; field-rules matrix; status syncM3-S2
B8Time limitsSLA policy; escalation; what the administrator sets upM3-S3
B9Notifications and automationMatrix: no. · name · event · recipients · channel · message · requirementM3-S3
B10QueriesCatalog: name · entity · conditions · used by · requirementM4-S1
B11Figures, counters, reports, documentsSummaries; counters; reports with schedule; templates; limits notedM4-S1
B12Audiences and access intentPer audience: screens, figures, phone, access intent; hand-off list for the administratorM4-S2
B13Design notesDecisions the builder must not change without asking; improvements to what existsM2-S1 onward
No.SectionWhat it holdsWritten in
C1Acceptance criteriaPer story, and per requirement that has no story: Given / When / Then, named people, negative casesM5-S1
C2Traceability matrixOne row per requirement, one column group per part; see the traceability job aidStarted M1-S2, complete M5-S1
C3Change requestsThe CR register and one form per CR; see the change-request job aidFrom M1-S2
C4Change logPer version: which CRs it carries, which sections changed, which criteria were rerunM6-S1