ACA — Certified Analyst · Course design
Section titled “ACA — Certified Analyst · Course design”This is the design of the course: what it must achieve, how the pieces build on each other, how the time is spent and how the learner is assessed. It is written for facilitators, reviewers and curious learners alike, and it contains no answers: practice answers are explained in the sessions, lab solutions are the visible worked solutions in each lab, and the assessment bank is kept separately.
1. The course at a glance
Section titled “1. The course at a glance”| Code and level | ACA · Level 2, Associate (apply and analyse) |
| Path | Analyst |
| Who it is for | Business analysts, product owners, process owners and digital-transformation leads who specify Osos solutions and never build them. |
| Docs audiences it maps to | Primary: Build apps, read through the design lens (what each option does and when to choose it, never how to click it). Secondary: Using, for what the delivered system looks like to its users. Go deeper only: Administration, for what an administrator sets up (working hours, holidays, human verification, permissions). Never: Integrate & extend, Setup, Core. |
| Technical ceiling | Reader-first: the builder’s option names and the product’s labels. No engine, enum, endpoint, stored-field or infrastructure names. Formulas are named, never written (“the builder writes the formula”). Access is stated as intent, never as levels. |
| Prerequisites | ACP, the universal gate. Nothing from the sibling Level 2 courses (ACD, ACSA) is assumed. |
| Prework | The practice-space check, 11 minutes, before Day 1 (at the top of M0-S1): sign in as yourself and as the pilot’s users, and confirm what you can see. Outside the contact hours. |
| Facilitated | 16 contact hours: four days of about 4 hours (Day 2 3 h 55, Day 4 4 h 05, so every session stays whole). The sessions derive to 857 minutes, plus four 15-minute breaks and 43 minutes of facilitated guided practice and Q&A (section 5). |
| On your own | 839 min of sessions (about 14 h), plus the 11-minute prework and the 160-minute assessment event. |
| Assessment | Outside the contact hours, one event of 160 minutes: a 40-item knowledge test (60 min), a change request handled alone from detection to plan (70 min), and the sign-off of your binder with a reviewer (30 min). See Assessment. |
| The running project | One project from start to finish. Bayt Devices, a fictional company that sells and services electronics, wants one support desk; its sponsor approves a charter, and the learner is the business analyst. The pilot the learner looks at is the Customer Support System built as in the documentation’s tutorial, which ACD also uses: module Customer Support System, entity Support Tickets, group Technical Support Office. The learner builds the project’s binder: BRD 0.1 to 1.0 (the signed baseline) to 1.1, the process definition with its maps, the blueprint 0.3 to 1.1, the traceability matrix and the change-request register, and carries one change request, CR-01, from a message to version 1.1. |
| How each lab works | Each lab has the learner write one complete example of each skill on the project, at full quality; the rest of that part of the binder is handed out from the reference binder, read and checked against their own work, and filed. Writing every page by hand would take about twice the course. |
Exit competencies
Section titled “Exit competencies”After ACA the learner can:
- Elicit and structure business requirements from interviews, documents and observation: map the current process, separate functional from non-functional needs with identifiers, sources and justified priorities, write user stories, and take the BRD to a signed baseline.
- Map a business need onto the platform’s building blocks and judge feasibility honestly: ready-made, configure, or not available with a workaround.
- Produce a conceptual data model: entity dictionary, status model, protection, relations, mapped fields and virtual entities, each tied to a requirement.
- Design the service catalog and request flows: front doors, audiences, public forms with human verification, watchers, drafts and on-behalf policy.
- Specify processes and workflows at design level: the future-process map and the process definition, then steps, owners and fallbacks, actions and routes, per-step field rules, status synchronisation, an SLA policy with escalation, and the notifications.
- Design what each audience sees, does and is told: queries, summaries and dashboards, counters, reports and document templates, views, faces and pages, and the access intent for each audience.
- Write acceptance criteria and a requirements-to-solution traceability matrix, and use them for change impact.
- Handle a change and hand over the binder: take a change request from detection through identification, definition and planning to its owner’s decision, write the decided change into every document it touches, and hand a builder a complete, reviewed BRD and blueprint.
2. Competency matrix
Section titled “2. Competency matrix”| # | Competency | Taught | Practised | Assessed |
|---|---|---|---|---|
| 1 | Elicit and structure | M1-S1 (objectives, scope, stakeholders), M1-S2 | M1-S2 worked scenario, both labs and the sign-off discussion | Knowledge test (M1 items); sign-off rows 1 and 2 |
| 2 | Map and judge feasibility | M1-S1 | M1-S1 guided tour and lab (A4 platform fit) | Knowledge test (M1 items); sign-off rows 2 and 12 |
| 3 | Conceptual data model | M2-S1, M2-S2 | M2 worked scenarios and labs; M2-S2 discussion | Knowledge test (M2 items); sign-off row 4 |
| 4 | Service catalog and request flows | M3-S1 | M3-S1 worked scenario and lab | Knowledge test (M3 items); sign-off row 5 |
| 5 | Processes, workflows, SLA and notifications | M3-S2, M3-S3 | M3-S2 demo, worked scenario and lab (map 2, the site visit workflow); M3-S3 worked scenario and lab | Knowledge test (M3 items); sign-off rows 3, 6 and 7 |
| 6 | What each audience sees, does and is told | M4-S1, M4-S2 | M4-S1 worked scenario and lab; M4-S2 demo and lab | Knowledge test (M4 items); sign-off rows 8 and 9 |
| 7 | Acceptance criteria and traceability | M5-S1 (with the matrix started in M1-S2) | M5-S1 worked scenario and lab (both checks); M6-S1 | Knowledge test (M5 items); sign-off row 10 |
| 8 | Handle a change; hand over the binder | Detect M1-S2, identify M2-S2, define M3-S3 and M4-S2, plan M5-S1, integrate M6-S1, review M6-S2 | CR-01 at every step: M1-S2 discussion, M2-S2 lab and discussion, M3-S3 discussion, M4-S2 lab, M5-S1 lab and the change board, the M6-S1 capstone; M6-S2 worked scenario and review | Knowledge test (change-request items, integrative items); the change request alone (its four rows); sign-off rows 11 and 12 |
The analyst never builds, so the course has no build lab. Every lab writes one part of the binder; the capstone writes a decided change into all of it, and the assessment event asks for one more change, handled alone.
3. Concept dependency map
Section titled “3. Concept dependency map”Every session declares the concepts it teaches and uses, with a depth: N name it, W what it is, U use it, B build it, D design it. A script checks that nothing is used before it is taught at the depth needed (earlier in this course, or in ACP) and that nothing is taught twice at the same depth. The full map is generated with the concept register; this is the course’s spine.
flowchart TB
ACP["From ACP: the pieces (W), records and requests (U),<br/>a first app built (B), access adds up (U)"]
subgraph M1["M1 From need to requirements"]
BA["Objectives, scope, feasibility (B)<br/>elicitation, register, stories (D)"]
BL["Current-process map (U)<br/>the baseline (D), a change spotted (U)"]
end
subgraph M2["M2 Data"]
DATA["Entities, fields, status, protection (D)"]
LINK["Relations, mapped fields,<br/>virtual entities (D)"]
end
subgraph M3["M3 Process"]
SVC["Service catalog, public forms (D)"]
WF["Future-process map, process definition,<br/>workflow and steps (D)"]
SLA["Time limits, working time,<br/>notifications (D)"]
end
subgraph M4["M4 What people see"]
INS["Queries, figures, counters,<br/>reports, templates (D)"]
AUD["Views, faces, pages,<br/>access intent (D)"]
end
AC["M5 Acceptance criteria, traceability,<br/>planning a change (D)"]
CAP["M6 Capstone: version 1.1, the review"]
ACP --> BA --> BL --> DATA --> LINK
DATA --> SVC --> WF --> SLA
LINK --> INS
WF --> INS --> AUD
SLA --> AUD
BL --> AC
AUD --> AC --> CAP
What to notice: every design topic sits on the data model, and the screens and access come last because they use everything before them. The baseline and the change request run beside the design from M1 to M6, which is why M1 and M5 can serve as a bridge.
| Session | Teaches | Uses (taught earlier, or by ACP) |
|---|---|---|
| M0-S1 | — | business-analysis@U, sign-in@U, portal-navigation@U, module@W, view@W, entity@B, entry@U, request@U, pointer@W, permission-level@U |
| M1-S1 | digital-transformation@U, business-analysis@B, success-measure@D | business-analysis@U, digital-transformation@W, view@U, view-face@U, workflow@U, request@U, notification@U, report@N, dashboard@N, sign-in@U, portal-navigation@U, web-vs-mobile@U |
| M1-S2 | business-analysis@D, process-map@U, process-definition@U, user-story@D, traceability@U, baseline@D, change-request@U | business-analysis@B, digital-transformation@U, success-measure@D |
| M2-S1 | module@D, entity@D, field@D, field-type@D, category@D, sensitive-field@D, encrypted-field@W, expression@N | entity@B, field@B, field-type@U, category@U, entry-lifecycle@W, workflow-step@W, permission-level@U, user@U, group@U, business-analysis@D |
| M2-S2 | relation@D, mapped-field@D, virtual-entity@D | entity@D, field@D, field-type@D, module@D, category@D, sensitive-field@D, workflow@U, user@U, change-request@U, traceability@U, baseline@D |
| M3-S1 | service@D, request@D, human-verification@D | service@U, request@U, inbox-outbox@U, entity@D, field-type@D, relation@D, view@U, group@U, user@U, permission-level@U |
| M3-S2 | process-map@D, process-definition@D, workflow@D, workflow-step@D | workflow@U, workflow-step@W, request@D, service@D, category@D, field@D, group@U, user@U, org-unit@W, expression@N, entry-lifecycle@W |
| M3-S3 | sla@D, working-time@D, reaction@D | workflow@D, workflow-step@D, process-definition@D, notification@U, reaction@U, group@U, user@U, field@D, category@D, mapped-field@D, expression@N, change-request@U, baseline@D, traceability@U |
| M4-S1 | query@D, pointer@D, statistic-query@D, dashboard@D, counter@D, report@D, template@D | query@U, pointer@W, entity@D, field@D, relation@D, mapped-field@D, workflow@D, workflow-step@D, sensitive-field@D, sla@D, expression@N, view@U, view-face@U, export@U, change-request@U, traceability@U |
| M4-S2 | view@D, view-face@D, page@D, widget@D, access-intent@D | view@B, view-face@B, page@U, widget@U, query@D, pointer@D, counter@D, dashboard@D, statistic-query@D, report@D, permission-level@U, group@U, role@U, user@U, sensitive-field@D, service@D, workflow-step@D, sla@D, reaction@D, mapped-field@D, web-vs-mobile@U, change-request@U, traceability@U |
| M5-S1 | acceptance-criteria@D, traceability@D, change-request@D | business-analysis@D, user-story@D, baseline@D, success-measure@D, process-definition@D, entity@W, workflow@U, view@U, query@U, reaction@U, notification@U, permission-level@U, sla@U |
| M6-S1 | — | business-analysis@D, change-request@D, traceability@D, baseline@D, acceptance-criteria@D, success-measure@D, process-definition@D, digital-transformation@U, mapped-field@D, sla@D, reaction@D, query@D, counter@D, statistic-query@D, view@D, access-intent@D |
| M6-S2 | — | business-analysis@D, change-request@D, traceability@D, baseline@D, acceptance-criteria@D, process-definition@D, entity@D, field-type@D, workflow@D, workflow-step@D, sla@D, reaction@D, query@D, statistic-query@D, report@D, view@D, view-face@D, access-intent@D |
Depth ceiling, by design. ACA designs; it never builds. Where a sibling course goes further, ACA stops short on purpose:
- Permissions. ACA writes access intent (see, create, change, act, be told) and a hand-off list for the administrator. The permission ladder, how levels combine and how they are granted belong to ACSA. ACA uses only what ACP taught: access from several sources adds up, there is no “deny”, and the lowest base level hides the Services menu.
- Expressions. Named only (“the builder writes the formula”). Writing them belongs to ACD; designing with them to ACE.
- Services. Designed (front door, audience, public forms, watchers, on-behalf, first form). Publishing and activating a service is ACD’s.
- Encrypted fields are taught at “what it is and what it costs”; choosing protection for a whole tenant belongs to ACSA.
- Process maps are swimlane maps drawn on paper or in any drawing tool, at the depth a business analyst needs to define a process. Process-modelling notations and simulation are outside the course.
4. Modules and sessions
Section titled “4. Modules and sessions”| Module | Session | After this you can | Facilitated min | Self-paced min |
|---|---|---|---|---|
| M0 — Start here | M0-S1 Start here: your practice space, the project and its binder | Say what the binder contains and how each part grows it, open it at version 0.1, and know whether ACP gave you what this course assumes. | 29 | 29 |
| M1 — From need to requirements | M1-S1 The analyst’s job, and the system you will specify | Recognise each building block of a delivered system, and write the objectives, scope, platform fit and stakeholders of a BRD. | 65 | 65 |
| M1 — From need to requirements | M1-S2 From interviews to a signed baseline | Map the current process, write the requirements register with stories and open questions, take it to the sponsor’s signature, and spot the first change in the messages that follow. | 129 | 129 |
| M2 — The data model | M2-S1 Entities, fields and the ticket’s status | Write an entity dictionary and a status model a builder can follow field by field, and list what must be settled before go-live. | 60 | 60 |
| M2 — The data model | M2-S2 Linking the data; identifying a change | Specify links, copied values and virtual entities, and take a logged change request to Identified. | 81 | 78 |
| M3 — Requests, routes and time | M3-S1 The service catalog: how requests come in | Decide how each kind of request enters the system, and write the service card a builder needs to publish it. | 38 | 38 |
| M3 — Requests, routes and time | M3-S2 From the future process to a workflow specification | Draw the future process, follow it into the process definition, and write a workflow specification a builder can configure without a question. | 91 | 91 |
| M3 — Requests, routes and time | M3-S3 Time limits, escalation, who is told; defining a change | Write an SLA policy with escalation and a notification matrix, and define a change request with its options. | 78 | 76 |
| M4 — What people see | M4-S1 Queries, figures and reports | Write the query catalog and the figures-and-reports plan, choosing the right surface for each question. | 56 | 56 |
| M4 — What people see | M4-S2 Screens and access for each audience | Write the audience matrix and the administrator’s hand-off list, and say what a change request adds to them. | 61 | 61 |
| M5 — Acceptance and traceability | M5-S1 Acceptance, traceability and planning a change | Write criteria for every requirement, check the matrix both ways, and bring a change request to its owner sized, with a recommendation. | 84 | 81 |
| M6 — Capstone | M6-S1 Capstone I: version 1.1, the decided change in every document | Write a decided change into every document it touches, and nothing else. | 52 | 52 |
| M6 — Capstone | M6-S2 Capstone II: the builder’s review, and your sign-off | Review a specification until a builder could start without a question, and prepare for the assessment event. | 33 | 23 |
| Total | 857 | 839 |
Job aids, used throughout: the case file (every lab), the builder’s options (M2 to M4), the BRD and blueprint template (from M0), the traceability matrix (from M1-S2), change requests (from M1-S2) and the readiness checklist (M6-S2).
5. Facilitated day plan
Section titled “5. Facilitated day plan”Each day is 240 minutes of contact time: the sessions, one 15-minute break, and any spare minutes, labelled Facilitated guided practice and Q&A. Sessions are kept whole and in order, so each day ends at a point where the binder is complete for that part. The spare time is not padding: the sessions are as long as their content derives (section 9), and the rest is kept for questions and for finishing labs.
Day 1: from need to a signed baseline
| Start | End | Min | Item |
|---|---|---|---|
| 09:00 | 09:29 | 29 | M0-S1 Start here |
| 09:29 | 10:34 | 65 | M1-S1 The analyst’s job, and the system you will specify |
| 10:34 | 10:49 | 15 | Break |
| 10:49 | 12:58 | 129 | M1-S2 From interviews to a signed baseline |
| 12:58 | 13:00 | 2 | Facilitated guided practice and Q&A |
| 240 | Day total |
Day 2: the data, and how requests come in
| Start | End | Min | Item |
|---|---|---|---|
| 09:00 | 10:00 | 60 | M2-S1 Entities, fields and the ticket’s status |
| 10:00 | 11:21 | 81 | M2-S2 Linking the data; identifying a change |
| 11:21 | 11:36 | 15 | Break |
| 11:36 | 12:14 | 38 | M3-S1 The service catalog |
| 12:14 | 12:55 | 41 | Facilitated guided practice and Q&A (catch up the binder before Part 3) |
| 235 | Day total |
Day 3: routes, time and figures
| Start | End | Min | Item |
|---|---|---|---|
| 09:00 | 10:31 | 91 | M3-S2 From the future process to a workflow specification |
| 10:31 | 10:46 | 15 | Break |
| 10:46 | 12:04 | 78 | M3-S3 Time limits, escalation, who is told; defining a change |
| 12:04 | 13:00 | 56 | M4-S1 Queries, figures and reports |
| 240 | Day total |
Day 4: audiences, tests and the capstone
| Start | End | Min | Item |
|---|---|---|---|
| 09:00 | 10:01 | 61 | M4-S2 Screens and access for each audience |
| 10:01 | 11:25 | 84 | M5-S1 Acceptance, traceability and planning a change |
| 11:25 | 11:40 | 15 | Break |
| 11:40 | 12:32 | 52 | M6-S1 Capstone I: version 1.1 |
| 12:32 | 13:05 | 33 | M6-S2 Capstone II: the builder’s review, and your sign-off |
| 245 | Day total |
Times assume a 09:00 start. Breaks sit between sessions. Day 2 ends at 12:55 and Day 4 runs to 13:05, so that every session stays whole and in order; the four days total exactly 16 hours (owner decision, 2026-11-23).
Outside the contact hours:
| Item | Min |
|---|---|
| Prework: the practice-space check, before Day 1 | 11 |
| Assessment event, part 1: knowledge test, 40 items | 60 |
| Assessment event, part 2: a change request, alone | 70 |
| Assessment event, part 3: capstone sign-off with a reviewer | 30 |
6. Self-paced plan
Section titled “6. Self-paced plan”A learner on their own follows the same sessions in the same order. Every discussion has an On your own form with a model answer, so the self-paced time is shorter where a group would talk (M2-S2, M3-S3, M5-S1, M6-S2). Suggested sittings, each ending at a resume point (the end of a session, or the marked resume point of M1-S2 or M3-S2):
| Sitting | Sessions | Sitting length |
|---|---|---|
| 0 | The prework in M0-S1 | 11 |
| 1 | M0-S1 | 29 |
| 2 | M1-S1 | 65 |
| 3 | M1-S2, up to the resume point | 56 |
| 4 | M1-S2, from the resume point | 73 |
| 5 | M2-S1 | 60 |
| 6 | M2-S2 | 78 |
| 7 | M3-S1 | 38 |
| 8 | M3-S2, up to the resume point | 20 |
| 9 | M3-S2, from the resume point | 71 |
| 10 | M3-S3 | 76 |
| 11 | M4-S1 | 56 |
| 12 | M4-S2 | 61 |
| 13 | M5-S1 | 81 |
| 14 | M6-S1 | 52 |
| 15 | M6-S2 | 23 |
Total on your own: 839 min of sessions (about 14 h), plus the 11-minute prework and the 160-minute assessment event. The M6-S2 review of your own binder needs a break of at least an hour after M6-S1; leave that gap between sittings 14 and 15.
7. Session designs
Section titled “7. Session designs”Each session’s segments, minutes and method. The minutes are derived (section 9); each session file repeats them in its headings.
M0-S1 — Start here: your practice space, the project and its binder (29 min)
Section titled “M0-S1 — Start here: your practice space, the project and its binder (29 min)”| Segment | Min | Self-paced | Method | What happens |
|---|---|---|---|---|
| Orientation | 2 | 2 | reading | What this course is, and the binder you will build |
| Concept | 3 | 3 | reading | The project pack, the binder, and how each part builds on the last |
| Lab | 18 | 18 | authored | Open the binder: BRD version 0.1 |
| Practice | 5 | 5 | rule | Are you ready for Level 2? |
| Recap | 1 | 1 | reading | Ready to start |
After it the learner can: Say what the binder you will build contains and how each part grows it, open it at version 0.1 with a business need the sponsor would sign, and know whether ACP gave you what this course assumes. On your own: 29 min. Full session: M0-S1.
M1-S1 — The analyst’s job, and the system you will specify (65 min)
Section titled “M1-S1 — The analyst’s job, and the system you will specify (65 min)”| Segment | Min | Self-paced | Method | What happens |
|---|---|---|---|---|
| Orientation | 1 | 1 | reading | Four people, one lost ticket |
| Concept | 8 | 8 | reading | Two documents, sub-documents, measurable objectives, platform fit |
| Guided demo | 11 | 11 | provisional | Tour the pilot as its users (six stops) |
| Lab | 38 | 38 | authored | Objectives, scope and platform fit (BRD A3, A4, A5) (with 1 min of hand-out reading) |
| Practice | 6 | 6 | rule | Check your understanding |
| Recap | 1 | 1 | reading | What you can do now |
After it the learner can: Say what goes into each document of the binder, recognise each building block of a delivered system, and write the objectives, scope, platform fit and stakeholders of a BRD. On your own: 65 min. Full session: M1-S1.
M1-S2 — From interviews to a signed baseline (129 min)
Section titled “M1-S2 — From interviews to a signed baseline (129 min)”| Segment | Min | Self-paced | Method | What happens |
|---|---|---|---|---|
| Orientation | 1 | 1 | reading | The list everything else traces back to |
| Concept | 10 | 10 | reading | Elicitation, swimlane maps, good requirements, stories, the baseline and the four kinds of message |
| Worked scenario | 2 | 2 | rule | One email, five requirements |
| Lab | 43 | 43 | authored | Map the current process (PDD 0.1, BRD A6) (with 3 min of hand-out reading) |
| Lab | 53 | 53 | authored | The register, open questions and user stories (A8, A9, A11; RTM first columns) (with 7 min of hand-out reading) |
| Discussion | 12 | 12 | rule | Sign-off, then five messages: which are changes? |
| Practice | 6 | 6 | rule | Check your understanding |
| Recap | 2 | 2 | reading | Your binder now: BRD 1.0, the baseline |
After it the learner can: Turn interviews, emails and observation into a current-process map, a numbered and prioritised requirements register with stories and open questions, take it to the sponsor’s signature, and spot the first change hiding in the messages that follow. On your own: 129 min. Full session: M1-S2.
M2-S1 — Entities, fields and the ticket’s status (60 min)
Section titled “M2-S1 — Entities, fields and the ticket’s status (60 min)”| Segment | Min | Self-paced | Method | What happens |
|---|---|---|---|---|
| Orientation | 1 | 1 | reading | From sentences to records |
| Concept | 12 | 12 | reading | Deciding the data |
| Worked scenario | 2 | 2 | rule | Four decisions on Support Tickets |
| Lab | 38 | 38 | authored | Entity dictionary, status model, protection and decide-early notes (B2 to B4, B13) (with 2 min of hand-out reading) |
| Practice | 6 | 6 | rule | Check your understanding |
| Recap | 1 | 1 | reading | What you can do now |
After it the learner can: Write an entity dictionary and a status model that a builder can follow field by field, with a requirement behind every choice, and list what must be settled before go-live. On your own: 60 min. Full session: M2-S1.
M2-S2 — Linking the data; identifying a change (81 min)
Section titled “M2-S2 — Linking the data; identifying a change (81 min)”| Segment | Min | Self-paced | Method | What happens |
|---|---|---|---|---|
| Orientation | 1 | 1 | reading | One entity is not a system |
| Concept | 11 | 11 | reading | Links, copies, calculated entities; identifying what a change touches |
| Worked scenario | 2 | 2 | rule | The account’s tier on every ticket |
| Lab | 49 | 49 | authored | Release 2 data (B2, B5, P6) and CR-01’s register line (with 3 min of hand-out reading) |
| Discussion | 10 | 7 | rule | CR-01: the tier now, or as it was? |
| Practice | 6 | 6 | rule | Check your understanding |
| Recap | 2 | 2 | reading | Your binder now: blueprint 0.3 |
After it the learner can: Specify how the entities of a system link, which values cross each link and how they stay up to date, and when a virtual entity is the right answer; and take a logged change request to Identified. On your own: 78 min. Full session: M2-S2.
M3-S1 — The service catalog: how requests come in (38 min)
Section titled “M3-S1 — The service catalog: how requests come in (38 min)”| Segment | Min | Self-paced | Method | What happens |
|---|---|---|---|---|
| Orientation | 1 | 1 | reading | The front door |
| Concept | 7 | 7 | reading | Designing how requests enter |
| Worked scenario | 3 | 3 | rule | The site visit card, and the tickets’ front door |
| Lab | 20 | 20 | authored | The pre-sales service card and its risks (B6, A10) |
| Practice | 6 | 6 | rule | Check your understanding |
| Recap | 1 | 1 | reading | What you can do now |
After it the learner can: Decide how each kind of request enters the system, and write the service card a builder needs to publish it. On your own: 38 min. Full session: M3-S1.
M3-S2 — From the future process to a workflow specification (91 min)
Section titled “M3-S2 — From the future process to a workflow specification (91 min)”| Segment | Min | Self-paced | Method | What happens |
|---|---|---|---|---|
| Orientation | 1 | 1 | reading | “Route it to the right person” |
| Concept | 10 | 10 | reading | The to-be map, the process definition, and what a workflow specification must say |
| Guided demo | 6 | 6 | provisional | Read the pilot’s workflow |
| Worked scenario | 3 | 3 | rule | The pilot’s workflow as a specification |
| Lab | 62 | 62 | authored | The to-be ticket map (PDD 1.0), the site visit workflow (B7), and BR-3, E-4 and one field-rules row (with 6 min of hand-out reading) |
| Practice | 8 | 8 | rule | Check your understanding |
| Recap | 1 | 1 | reading | What you can do now |
After it the learner can: Draw the future process as a swimlane map, follow it into the process definition, and write a workflow specification a builder can configure without a single question. On your own: 91 min. Full session: M3-S2.
M3-S3 — Time limits, escalation, who is told; defining a change (78 min)
Section titled “M3-S3 — Time limits, escalation, who is told; defining a change (78 min)”| Segment | Min | Self-paced | Method | What happens |
|---|---|---|---|---|
| Orientation | 1 | 1 | reading | The 09:30 email, again |
| Concept | 9 | 9 | reading | Time, escalation and messages; the problem behind a request |
| Worked scenario | 2 | 2 | rule | The representative’s two days |
| Lab | 46 | 46 | authored | SLA policy and notification matrix (B8, B9), status row S2 and control C-2 (with 8 min of hand-out reading) |
| Discussion | 12 | 10 | rule | CR-01: what is it really asking, and what are the options? |
| Practice | 6 | 6 | rule | Check your understanding |
| Recap | 2 | 2 | reading | Your binder now: blueprint 0.6, PDD 1.0 |
After it the learner can: Write an SLA policy with escalation and a notification matrix for a workflow, tell the administrator what they rest on, and define a change request with its options. On your own: 76 min. Full session: M3-S3.
M4-S1 — Queries, figures and reports (56 min)
Section titled “M4-S1 — Queries, figures and reports (56 min)”| Segment | Min | Self-paced | Method | What happens |
|---|---|---|---|---|
| Orientation | 1 | 1 | reading | “About sixty” |
| Concept | 8 | 8 | reading | From a question to a figure |
| Worked scenario | 2 | 2 | rule | “Who is overloaded, and how long do tickets take?” |
| Lab | 38 | 38 | authored | Query catalog, summaries, report (B10, B11) (with 1 min of hand-out reading) |
| Practice | 6 | 6 | rule | Check your understanding |
| Recap | 1 | 1 | reading | What you can do now |
After it the learner can: Write the query catalog and the figures-and-reports plan of a blueprint, choosing the right surface for each question the business asks. On your own: 56 min. Full session: M4-S1.
M4-S2 — Screens and access for each audience (61 min)
Section titled “M4-S2 — Screens and access for each audience (61 min)”| Segment | Min | Self-paced | Method | What happens |
|---|---|---|---|---|
| Orientation | 1 | 1 | reading | Same data, different people |
| Concept | 6 | 6 | reading | One audience at a time |
| Guided demo | 7 | 7 | provisional | What each audience sees today |
| Lab | 39 | 39 | authored | The audience matrix and hand-off list (B12); CR-01 part 4, second half (with 1 min of hand-out reading) |
| Practice | 6 | 6 | rule | Check your understanding |
| Recap | 2 | 2 | reading | Your binder now: blueprint 0.9 |
After it the learner can: Write the audience matrix of a blueprint, for every group of people their screens, figures, device, and what they must see, do and be told, and say what a change request would add to it. On your own: 61 min. Full session: M4-S2.
M5-S1 — Acceptance, traceability and planning a change (84 min)
Section titled “M5-S1 — Acceptance, traceability and planning a change (84 min)”| Segment | Min | Self-paced | Method | What happens |
|---|---|---|---|---|
| Orientation | 1 | 1 | reading | Is it done? |
| Concept | 7 | 7 | reading | Tests written before the build; reading a change across the matrix |
| Worked scenario | 1 | 1 | rule | Criteria for “each person is told” |
| Lab | 58 | 58 | authored | Criteria, the complete matrix, CR-01’s impact and recommendation (with 6 min of hand-out reading) |
| Discussion | 10 | 7 | rule | The change board |
| Practice | 6 | 6 | rule | Check your understanding |
| Recap | 1 | 1 | reading | Your binder now: blueprint 1.0, traced |
After it the learner can: Give every requirement a test the delivered system passes or fails, prove with one table that nothing was forgotten and nothing was added unasked, and bring a change request to its owner sized, with a recommendation. On your own: 81 min. Full session: M5-S1.
M6-S1 — Capstone I: version 1.1, the decided change in every document (52 min)
Section titled “M6-S1 — Capstone I: version 1.1, the decided change in every document (52 min)”| Segment | Min | Self-paced | Method | What happens |
|---|---|---|---|---|
| Orientation | 1 | 1 | reading | One change, every document |
| Capstone | 46 | 46 | authored | Integrate CR-01: BRD 1.1, change log, register, matrix (with 6 min of hand-out reading) |
| Practice | 4 | 4 | rule | Check your understanding |
| Recap | 1 | 1 | reading | What you have now |
After it the learner can: Take a decided change into every document it touches, so the sponsor, the builder and the tester each find it where they look, and nothing the change did not touch has moved. On your own: 52 min (a capstone session). Full session: M6-S1.
M6-S2 — Capstone II: the builder’s review, and your sign-off (33 min)
Section titled “M6-S2 — Capstone II: the builder’s review, and your sign-off (33 min)”| Segment | Min | Self-paced | Method | What happens |
|---|---|---|---|---|
| Orientation | 1 | 1 | reading | Read it as the builder will |
| Concept | 3 | 3 | reading | What the sign-off asks: a change request alone, and the rubric |
| Worked scenario | 3 | 3 | rule | Seven defects in someone else’s blueprint |
| Discussion | 20 | 10 | rule | The builder’s review of your binder |
| Practice | 4 | 4 | rule | Check your understanding |
| Recap | 2 | 2 | reading | Your binder now: the hand-in |
After it the learner can: Read a specification until a builder could start without a question, fix your own the same way, and walk into your sign-off knowing what it asks. On your own: 23 min. Full session: M6-S2.
8. Assessment blueprint
Section titled “8. Assessment blueprint”The assessment is one event of 160 minutes outside the contact hours, in three parts. The learner brings the binder at version 1.1, as M6-S1 left it and M6-S2 reviewed it.
| Part | Time | What it assesses | To pass |
|---|---|---|---|
| 1. Knowledge test | 60 min | 40 single-best-answer items, almost all short situations at the “apply” or “analyse” level | 28 of 40 (70 %) |
| 2. A change request, alone | 70 min | A message the learner has not seen, arriving after version 1.1, taken through detect, identify, define and plan on their own binder, with no coaching | every one of its 4 rubric rows |
| 3. Sign-off with a reviewer | 30 min | The binder at version 1.1 (BRD, process definition, blueprint, traceability matrix, change-request register and change log), graded against the published rubric; the reviewer asks the learner to trace lines and justify decisions | every one of its 12 rubric rows |
Knowledge test. Items are drawn from an instructor-only bank that never appears on a learner page. Distribution, weighted by contact time, with the change-request steps as their own line because they run through five sessions:
| Area | Items on a form |
|---|---|
| M1 From need to requirements (competencies 1, 2) | 8 |
| M2 The data model (3) | 7 |
| M3 Requests, routes and time (4, 5) | 9 |
| M4 What people see (6) | 6 |
| M5 Acceptance and traceability (7) | 4 |
| Change requests: detect, identify, define, plan (8) | 4 |
| Integrative, across modules (8) | 2 |
| Total | 40 |
The change request, alone. Its brief and rubric are published on the assessment page, so the learner knows what is asked; the message itself is not published until the event, where it is handed out. Three forms of the same size rotate between sittings (CR-02, CR-03, CR-04), each with its model in the bank. The learner does not change the documents themselves: a change request is written into them only after its decision. A reviewer grades the hand-in against the four published rows, one per step; the model answer and the grading notes are in the bank.
Capstone sign-off. The learner sends the binder at least two working days before the event. A reviewer grades it against the twelve-row rubric on the assessment page, then meets the learner and asks them to trace two lines (a requirement to its design and criteria, a design element back to its requirement) and to justify two decisions. A failed row is returned for resubmission; the learner does not retake the course.
Pass standard. 70 % on the knowledge test, and all four change-request rows, and all twelve sign-off rows.
Practice is not assessment. Every session ends with explained practice questions, written separately from the bank and never reused in it. The labs’ worked solutions are published, and the reference binder’s pages are published in the labs’ worked solutions and hand-outs; the model answer to the assessed change request and the grading notes are not.
9. Timing method
Section titled “9. Timing method”Every minute is derived from the material, following the authoring spec (§9.2) and the rebuild contract
(§6). The ledger timing/aca.json holds one entry per segment with its method and inputs, generated from
the session files. Each segment is rounded to the nearest whole minute (at least 1 for any text).
| Segment type | Method | Rule |
|---|---|---|
| Orientation, Concept, Recap | reading | Learner-visible words ÷ 180 per minute (counted by script), + 1 min per table or diagram to study. Facilitator-only notes are not counted. |
| Lab, Capstone | authored | ACA’s labs are writing labs, so they were timed by doing them on the project: an experienced analyst wrote the whole binder (the reference binder), and each lab’s slice was measured. Expert minutes = words of input read ÷ 200 + words of deliverable written ÷ 20 + 1 per diagram node group (a task or decision with its labelled ways out). Segment minutes = expert minutes × 1.5 (novice margin) + 0.5 per checklist item + instruction words ÷ 180, plus any flat step the lab states, plus the reading of what the lab hands out: the reference pages it gives the learner to read, check and file, words ÷ 180. The troubleshooting table and the worked solution are not counted. |
| Guided demo | provisional | Screens studied × 1.5 + instruction words ÷ 180, until timed live on the platform. |
| Worked scenario | rule | Words ÷ 180 × 1.5 (analysis reading, deciding before reading on). |
| Discussion | rule | Facilitated: the stated format. On your own: 3 min per prompt + the model answer’s reading time. |
| Practice | rule | 1.25 min per question, explanation reading included. |
Why writing labs, and why each skill once. Writing the whole binder by hand, as the expert did, would take a learner about 1,575 minutes of labs, about 31 hours of sessions in all: twice the course. So each lab has the learner write one complete example of each skill on the project, and hands out the reference version of the rest of that part of the binder, which the learner reads, checks against their own work and files. Nothing an exit competency needs is handed out unwritten: every kind of row, section and diagram is written at least once. The program owner chose this design (plan H, 2026-11-23), with the change request of the assessment event done outside the contact hours.
Result. The sessions derive to 857 min: 801 minutes as planned, 2 more from the discussions and practice as written, 10 more for the rows the M3-S2 and M3-S3 labs added so that every kind of process definition row, field-rules row and status row is written once, and 44 minutes of hand-out reading counted inside the labs (M1-S1 1, M1-S2 3 and 7, M2-S1 2, M2-S2 3, M3-S2 6, M3-S3 8, M4-S1 1, M4-S2 1, M5-S1 6, M6-S1 6). With four 15-minute breaks, that is 917 minutes of the 960. Packed whole and in order, Days 1 to 3 have 2, 41 and 0 minutes of Facilitated guided practice and Q&A, and Day 4 needs 245 minutes: M4-S2 and M5-S1 cannot move to Day 3 without overfilling it, and M3-S2 cannot move to Day 2. The program owner’s decision (2026-11-23): Day 4 runs over 4 hours (now 4 h 05), and Day 2’s guided practice gives up the difference (41 minutes), so the course is exactly 960 minutes with no content trimmed and the official hours unchanged.
Limits to keep in mind.
- The labs are an expert’s run on paper, not a cohort’s. The provisional rule overestimated every ACP lab timed live by about two; writing labs may behave the other way. Two authors re-applied the rule to their pages as written and found M2-S1 and M2-S2 a few minutes longer than planned (more instruction words); the ledger notes say where.
- IDs and short cell values count as words, so table-heavy labs (the register, the matrix, the notification matrix) may be overstated by 10 to 20 %.
- One minute per node group assumes drawing on paper or in a simple tool; the labs say so.
- The three guided demos are provisional until timed live on the platform.
- The knowledge test is 60 minutes for 40 items (ACP: 50), because almost every ACA item is a scenario.
Blend (reported, not enforced)
Section titled “Blend (reported, not enforced)”| Share of session minutes | ACA | Analyst profile |
|---|---|---|
| Applied (guided demo, lab, worked scenario, capstone) | 69 % (592 min) | at least 50 % |
| Concept (orientation, concept, recap) | 15 % (126 min) | at most 35 % |
| Practice | 9 % (75 min) | at least 10 % |
| Discussion | 7 % (64 min) | reported on its own |
Practice is just under the profile because the sessions grew around it (every session keeps at least the items it had); it is not fixed by editing minutes.
10. Demo data and screenshots
Section titled “10. Demo data and screenshots”Learners look at a practice space that holds the published Customer Support System, the pilot, built exactly as the documentation’s tutorial (and ACD) builds it: module Customer Support System; entity Support Tickets with its nine fields; the five-step workflow; seven notifications; the queries Closed tickets and All tickets; the views Ticket Request and Incoming Requests; the summary Ticket Status; the report Performance Report. ACA adds only what its tours need:
- the learner’s own analyst account (screenshots: Nadia Saeed), system level View, with View on the module, so it can read the module’s pages but not open the designer;
- the tutorial’s four accounts (Customer One, Desk Agent, Representative One, Support Manager) and the group Technical Support Office, plus Customer Two, so the access question in M4-S2 can be checked;
- seeded tickets at each step (Help Desk, Processing Ticket, Service Evaluation, closed, duplicate), from both customers.
Because learners only look, one practice space can serve a whole cohort. Everything else the learner works from is on paper: the case file (the project pack) and the hand-outs in each lab. The seed specification, and the list of screenshots with the state each needs, are kept with the course’s capture files, so every shot can be re-shot. Release 2 (accounts, site visits, the public form) is designed in the course and never seeded.
11. Bridges and boundaries with other courses
Section titled “11. Bridges and boundaries with other courses”- What ACA assumes from ACP: the pieces and how a request travels (ACP M2, M5), records and saved
filters with
@me(M4), a first app with a view and one reaction (M6 to M9), and how access adds up (M8). The placement self-check in M0-S1 tests exactly these. - ACA and ACD share the running case. ACD builds the Customer Support System; ACA specifies it. ACA uses ACD’s names and never links into ACD (sibling courses do not depend on each other).
- ACE’s analysis bridge. A learner who holds ACD but not ACA takes M1 (From need to requirements) and M5 (Acceptance, traceability and planning a change) of this course as self-paced prework before ACE: 275 minutes on their own (M1 194, M5 81). M5 is written so that an ACD holder can follow it: its lab hands out the matrix at the end of Part 4 and recaps CR-01 so far.
- What later courses can rely on from ACA: requirements registers and baselines, process definitions, design-level data models and workflow specifications, access intent, acceptance criteria, traceability, and change requests handled end to end (ACE, ACM).