How you are certified as an ACA — Certified Analyst: what the assessment event holds, what you must achieve, the change request you take on alone, the binder you hand in and how each is graded, and some practice questions in the style of the test.

The assessment is one event of 160 minutes, outside the course’s 16 contact hours, in both the facilitated and the self-paced mode. Bring your binder at version 1.1, as you finished it in M6-S1 and reviewed it in M6-S2.

PartWhat it isTimeTo pass
1. Knowledge test40 questions, each with one best answer. Almost all describe a situation from a project and ask what you would specify, what is wrong, or what happens; few ask you to recall a label.60 min28 of 40 (70 %)
2. A change request, aloneA message you have not seen is handed out at the event; it arrives after version 1.1. You take it through all four steps on your own binder, with no coaching, and hand in what each step produces.70 minevery one of its 4 rows
3. Sign-off with a reviewerA reviewer grades your binder against the sign-off rubric below, asks you to trace two lines through it, and asks you to explain two of your decisions. Send the binder at least two working days before.30 minevery one of its 12 rows

You are certified when you pass all three parts. A sign-off or change-request row that fails is returned to you to fix and resubmit; you do not retake the course.

The questions follow the time each module gets in the course, with the four steps of a change request as their own line because they run through five sessions:

AreaQuestions
M1 From need to requirements8
M2 The data model7
M3 Requests, routes and time9
M4 What people see6
M5 Acceptance and traceability4
Change requests: detect, identify, define, plan4
Across modules2

Everything the test asks is taught in the course. It does not ask you to build, click through the designer, write formulas or set access levels: those belong to the builder and the administrator.

Your capstone is the binder itself: the BRD, its process definition and maps, the blueprint, the acceptance criteria, the traceability matrix and the change-request register, at version 1.1, with CR-01 written into every document it touched. The assessment event tests it in two ways: you take one more change request through it on your own (part 2), and a reviewer signs it off (part 3).

The brief and the rubric below are public, so you know exactly what is asked. The message itself is not: it is handed out at the start of part 2, and it is a request you have not seen before, from someone on the Bayt Devices project, about the system your binder specifies. On the day you work alone, on your own binder, with the change-request job aid and your CR-01 trail open; nobody coaches it. Your CR-01 is your worked example: you have done each step once already, and the message is of the same size.

What you hand in. Take the message through the four steps, on your version 1.1 binder:

  1. Detect. Is it a change, a clarification, a defect or a next-phase idea? Say why, against the baseline, and write the reply to the sender.
  2. Identify. The CR register line: type, requester and source, every affected ID, the owner who decides it, and why that person.
  3. Define. The CR form, parts 1 to 4: the request, the problem behind it, what it touches (with the baseline text each item changes), and at least two options, one of them “do nothing”, each with what it changes in the BRD, the process definition and the blueprint.
  4. Plan. Parts 5 to 7: impact and size per option from the traceability matrix, your recommendation, the decision you are asking for and from whom, the release you propose and why, the tests to write and rerun, and who is told.

You do not change the documents themselves: a change request is written into them only after its decision, as you did with CR-01 in M6-S1.

Each row passes or fails on its “Pass when” column.

RowStepPass when
1DetectThe message is classified as a change, a clarification, a defect or a next-phase idea, with the baseline text (requirement or decision) it contradicts or matches named. The reply tells the sender what happens next, who decides, and what stays in force until then.
2IdentifyThe register line is complete: date, requester and source, summary, type, status, and the affected IDs found by reading the matrix across and down, including decisions, process steps, rules and controls, blueprint sections and criteria, not only the requirement the sender names. The owner who decides is named, with the reason from the project charter.
3DefineForm parts 1 to 4: the request quoted; the problem behind it in the business’s words; what it touches, with the baseline text each item changes; at least two options, one of them “do nothing”, each saying what it changes in the BRD, the process definition (its rules and controls included) and the blueprint. Data and rules are designed with the builder’s options and within the platform’s limits.
4PlanForm parts 5 to 7: each option sized from the matrix, with its risk and its cost on stored records; a recommendation with its reason; the decision asked for and from whom; the release proposed, with its reason; the criteria to write, each naming who is signed in, with at least one negative case, and those to rerun; who is told.

Any of these fails the part, whatever the rows say: a document changed before the decision; an ID reused or renumbered; Hidden used as if it protected a value; an access level written as the design.

What you hand in. Your binder at version 1.1, following the BRD and blueprint template: BRD 1.1 (A0 to A11), the process definition with its maps, blueprint 1.1 (B1 to B13), acceptance and change (C1 to C4: the criteria, the traceability matrix, the change-request register with CR-01’s form and decision, and the change log). Where you filed a hand-out from the reference binder, it is part of your binder; you answer for it as for your own pages. The binder must be your own work.

Each row passes or fails on its “Pass when” column.

RowSectionsPass when
1 Requirements and the baselineA6 to A9, A11Every need in the case file is a requirement: one testable need per row, with an ID, F or NF, a source and a priority with a reason that names an objective. Every Release 1 Must that a person does has a user story. Every open question shows its answer, and every decision who took it and when. BRD 1.0 is signed, and no ID was reused or renumbered after it.
2 Objectives, scope, summaryA0 to A5, A10A0 shows every version with its date and approval. At least three measurable objectives, each with its success measure. The scope lists in, out and later, and every need the platform cannot meet with its workaround. The stakeholders say who approves what. The summary fits on half a page and names the decisions asked of the sponsor. The risks name what could stop the objectives.
3 The process definitionProcess definition, mapsThe current and future maps have one lane per role, a label on every way out of a decision, a hand-off that says what is handed over, and a limit on every wait for a person. The step table names each step’s requirement and the workflow step that carries it. Rules, exceptions, escalation, measures and controls are in the business’s words, and every pain point is removed somewhere or listed as open.
4 DataB1 to B5, B13Every field has a type, required or not, and who fills it in, and nothing filled in later is required on the entity. Every status value has an owner and a moment. References sit on the “many” side; every copied value has an Update Mode with a reason; protected fields say who may see them. The design notes list what must not change after go-live.
5 Front doorsB6Every request type has a front door with a reason; every service card states audience, public-form protection where relevant, watchers, drafts and on-behalf policy.
6 WorkflowsB7Every step has an owner, and every owner that is not one fixed person has a fallback ending with a named person. Every step has one main action; returns and rejections have deliberate targets. The field-rules matrix is complete. The binder says how each status is kept in step.
7 Time and notificationsB8, B9Every limit is in working time against a named schedule; every escalation states its waits, repeats and limit; what the administrator sets up is listed with its deadline. Every notification row has one event, its recipients and its message, and messages that depend on a decision name the action.
8 Figures and reportsB10, B11Every figure, counter and report names a query from the catalog, and every query’s name says whose records it holds. The design respects the 7-column PDF, web-only reports, the figures’ exclusion of archived records, and that a counter is seen by whoever may open its view.
9 Audiences and accessB12Every audience has screens with a default face; access intent is written as rules a tester can check by signing in; no access levels appear; the hand-off list names every group, person and setting the design depends on.
10 Acceptance and traceabilityC1, C2Every requirement has at least one criterion naming who is signed in and what they see, with negative criteria for access. The matrix has one row per requirement and no unexplained gap in either direction.
11 The change, written inC3, C4, version 1.1CR-01 is in the register with its form, decision and date. Every document it touched is at version 1.1 and carries it; the change log names the sections changed and the criteria rerun; the matrix’s Changed by column names it; nothing CR-01 did not touch has changed.
12 Ready for a builderThe whole binderThe blueprint uses the builder’s option names, invents no feature, and contains no click-path, formula or access level. The reviewer can say, for any point of any workflow, who has the record and what they can do.

Self-assessment. Before you book the event, score your binder against each row, using the readiness checklist, and fix every row you cannot pass:

  • I can point to the line that passes each of the twelve rows.
  • I can trace any requirement to its design and its criteria, and any design element back to its requirement, in a minute.
  • Every document is at version 1.1, and the change log says what CR-01 changed.
  • I can explain why I chose each Update Mode and each step owner.
  • I have read the change-request brief and the four steps in the job aid.

These are practice questions written for this page; they are not taken from the test. Each option explains itself.

PracticeChoose one answer.

In a hospital’s equipment-repair project, a nurse says: “Broken pumps sit in the corridor for days because nobody knows who should collect them.” What is the best first entry in your register?

  1. Explanation for A

    ✓ Correct

    Correct: a testable business need, with an open question for the time limit’s figure. See What a good requirement looks like.

  2. Explanation for B

    ✗ Incorrect

    Not this one: that is a design choice for the blueprint, written before you know the need. See What a good requirement looks like.

  3. Explanation for C

    ✗ Incorrect

    Not this one: it blames a symptom, names no result, and could not be tested. See Objectives you can measure.

Check your answer

The correct answer is A. Open the explanation under each option to see why.

PracticeChoose one answer.

An invoice shows the customer’s credit limit. Finance wants each invoice to keep the limit that applied when it was issued. Which Update Mode do you specify for the copied value?

  1. Explanation for A

    ✗ Incorrect

    Not this one: the copy would follow every later change to the customer’s limit. See Mapped fields.

  2. Explanation for B

    ✓ Correct

    Correct: the value is copied once and stays as it was when the invoice was made. See Mapped fields.

  3. Explanation for C

    ✗ Incorrect

    Not this one: it would also let an edit on the invoice change the customer’s limit. See Mapped fields.

Check your answer

The correct answer is B. Open the explanation under each option to see why.

PracticeChoose one answer.

A grant application must be scored by every member of a five-person panel, all at once, and moves on only if at least three approve. What do you specify for the panel’s step?

  1. Explanation for A

    ✓ Correct

    Correct: all are asked at once, and three approvals move the application on. See Who acts at a step.

  2. Explanation for B

    ✗ Incorrect

    Not this one: Sequential asks the members one after another; the panel must score all at once. See Who acts at a step.

  3. Explanation for C

    ✗ Incorrect

    Not this one: one member would claim it and decide alone. See Who acts at a step.

Check your answer

The correct answer is A. Open the explanation under each option to see why.

PracticeChoose one answer.

A complaint reaches a step on Sunday at 15:00, with a limit of 2 working hours on a schedule of Sunday to Thursday, 08:00 to 16:00, and no holidays. When is it Overdue, and what happens then?

  1. Explanation for A

    ✗ Incorrect

    Not this one: working time stops at 16:00, and nobody is told unless an escalation is specified. See When a step runs late.

  2. Explanation for B

    ✗ Incorrect

    Not this one: that counts a whole day; and no step moves unless an automation is specified. See Time limits on a step.

  3. Explanation for C

    ✓ Correct

    Correct: one hour on Sunday and one on Monday; Overdue alone only marks the step. See Time limits on a step.

Check your answer

The correct answer is C. Open the explanation under each option to see why.

PracticeChoose one answer.

Requirement: “Suppliers see only their own invoices.” Which acceptance criterion proves it best?

  1. Explanation for A

    ✓ Correct

    Correct: a negative criterion with named people and an observable result. See Acceptance criteria.

  2. Explanation for B

    ✗ Incorrect

    Not this one: “correctly” cannot be observed, and it checks settings, not results. See Acceptance criteria.

  3. Explanation for C

    ✗ Incorrect

    Not this one: it shows the supplier can see something, not that they cannot see others’. See Acceptance criteria.

Check your answer

The correct answer is A. Open the explanation under each option to see why.

PracticeChoose one answer.

A school’s absence system went live two weeks ago. Its signed BRD says: “Parents are told by email on the day a child is marked absent.” A father writes: “My son was marked absent on Monday, and I heard nothing until Wednesday.” What is his message?

  1. Explanation for A

    ✗ Incorrect

    Not this one: a clarification explains what the baseline means; here the meaning is clear and the system broke it. See The baseline, and the four kinds of message.

  2. Explanation for B

    ✗ Incorrect

    Not this one: he asks for nothing new or different; he expects what the signed BRD already promises. See The baseline, and the four kinds of message.

  3. Explanation for C

    ✓ Correct

    Correct: the baseline says “on the day”, and the delivered system did not do it, so the build fails a signed requirement; no change request is needed. See The baseline, and the four kinds of message.

  4. Explanation for D

    ✗ Incorrect

    Not this one: a next-phase idea is new and can wait; the father reports a promise the live system is already failing. See The change-request job aid.

Check your answer

The correct answer is C. Open the explanation under each option to see why.

  • Do every Practice section in the sessions again; each option is explained.
  • Read your CR-01 trail from M1-S2 to M6-S1 once more, with the change-request job aid: it is the worked example of part 2.
  • Keep the design options job aid and the readiness checklist beside you while you finish your binder.
  • Score your binder against every sign-off row before you book the event.