M11-S1 — Capstone I: brief, scope and plan

Section titled “M11-S1 — Capstone I: brief, scope and plan”
ModuleM11 — Master capstone
After this session you canScope the Field Service module and your new capability, and plan their architecture, security and operations for sign-off.
Time88 min with a facilitator · about 85 min on your own
Before you startModules 0 to 10, with your artefacts: the risk register (M1-S1), the governance plan (M1-S2), the threat-model card, the no-code checklist, the operations plan template (M9-S2), your standard (M10-S1). The capstone rubric open. Larkspur Dev open as rami.aziz.
Go deeperModules (build guide) · Environments and promotion

◆ Orientation (1 min) — Your program now

Section titled “◆ Orientation (1 min) — Your program now”

From here on there are no click-paths. The capstone is one piece of work across seven sessions: you scope and plan it here, build the Field Service module (M11-S2), build your new capability in your strand (M11-S3 or M11-S4), ship and operate both (M11-S5), document them and review a peer’s (M11-S6), and prepare your defense (M11-S7). Each session ends at a resume point with an artefact the next one uses.

This session decides whether the rest goes well. A capstone fails far more often from a scope that was too large, a capability that needs no extension, or acceptance criteria nobody can test, than from a build mistake. Scope carefully, write it down, and get it signed off.

★ Capstone (71 min) — The brief, your scope and your plan

Section titled “★ Capstone (71 min) — The brief, your scope and your plan”

The brief. Larkspur Industrial Group’s board has approved two things for the Operations Suite you have looked after through the course: a Field Service module, and one new capability that the platform does not have today. You deliver both to production quality, ship and run them, document them, review another master’s work, and defend your decisions. The work is done in the capstone sessions M11-S1 to M11-S7, without step-by-step instructions.

PartWhat you deliverSession
A. Scope and planThe Field Service requirements register with build tiers and acceptance criteria; your chosen capability’s specification; the architecture, security and operations outline; your plan, signed off by the facilitator or checked against the self-scoping checklistM11-S1
B. The Field Service moduleService visits dispatched to technicians, worked on site and signed off; the parts they use taken from Asset Maintenance’s spare parts; a completed visit closing its work order; web and mobile screens for dispatchers and technicians; an acceptance runM11-S2
C. The new capabilityYour capability, built in your strand: through documented extension points (extension strand) or inside the engine (source strand); and the no-code proof: a builder configures and extends it on the web and the phone without codeM11-S3 or M11-S4
D. Ship and operateThe module and the capability promoted to your lab release as versioned packages (and, in the source strand, your build); a threat model of the capability; its operations plan and one runbook; a performance checkM11-S5
E. Document and reviewThe program’s architecture documentation; your review of another master’s capstone in the five-part formatM11-S6
F. DefendYour defense notes: eight decisions, each with the requirement, the option you rejected, the evidence and the trade-offM11-S7

Choose your capability from this list, or propose your own in M11-S1 against the same bar (a real business need, one outside system or technology, and something a builder must be able to configure afterwards):

  1. Travel-time dispatch. When a visit is dispatched, an outside routing service estimates the technician’s travel time, and dispatchers see it on the board.
  2. Supplier risk scores. An outside rating feed scores suppliers each night; a falling score opens a review in Supplier Management.
  3. Photo evidence check. A technician’s site photo is checked by an outside image service before a visit can be signed off.

The course provides a stub of each outside service, so you never need a real one. Use only fictional data.

The rubric that every part is assessed against is on the assessment page. Keep it open: each task below names the rubric rows it produces evidence for.

1. Choose and specify the capability (rubric rows 1 and 5). Choose one of the three, or propose your own against the bar. Write its specification on one page: the business need in two sentences; the outside system and the stub that stands in for it; what happens, step by step, from the business’s point of view; what a builder must be able to configure afterwards without code (for example, which visits get a travel estimate, the score below which a review opens, which visit types need a photo); its acceptance criteria; and the extension point it deserves, chosen with the extension map and, on the source strand, M8-S1’s four tests.

2. Write the Field Service requirements register (row 1). One line per requirement, at least twelve, covering dispatching, on-site work, parts, sign-off, the work-order link, the dispatcher’s and the technician’s screens, access, and reporting. Each line has an owner (Huda Rahman for dispatch, Maya Idris for on-site work, Omar Haddad for parts and work orders, Leila Amari for reporting), a build tier (no-code, low-code, deep code) with its reason, and an acceptance criterion someone else can pass or fail.

3. Outline the architecture (row 2). The Field Service module (field_service) with Service Visits, Visit Tasks and Parts Used; how it reaches Asset Maintenance (work orders, assets, spare parts) only through declared seams; the visit’s workflow and who owns each step; the automation between modules and what makes it run once per event; the screens for web and phone. Write three decision records now (each: the decision, the options, the one you rejected and why).

4. Outline the security (row 6). Steps 1 and 2 of the threat-model card: assets, and every new door with its credential (the stub calls, any application user, any outbound call). You complete the model in M11-S5.

5. Outline the operations (row 7). The promotion path from Larkspur Dev to your lab release, as M1-S2 set it for the program; the packages and versions you will ship; what cannot travel in a package and is a manual step; one runbook you expect to need.

6. Plan the work across M11-S2 to M11-S7, with one checkpoint per session: what will exist at its end, and how you will know.

7. Scope check and sign-off. Check your plan against the self-scoping checklist below. With a facilitator, present it in the scoping clinic (the discussion) and record the sign-off. On your own, tick the checklist honestly; every unticked item is a change to your scope before M11-S2.

  • The capability meets the bar: a real business need, one outside system, and something a builder configures afterwards.
  • The capability uses the extension point it deserves and no deeper one, and the specification says why.
  • The capability fits in one capstone session (about 210 minutes of building), including its no-code proof.
  • Every register line has an owner, a tier, a reason and an acceptance criterion someone else can test.
  • Field Service reaches other modules only through declared seams.
  • Every cross-module automation says what makes it run once per event and who hears of its failures.
  • Every new door has a named credential with the narrowest grant.
  • The promotion path is the program’s, and the manual steps are listed.
  • The plan has a checkpoint for each session, and nothing depends on a real outside service.
  • All data is fictional, with example.com addresses.

If something goes wrong

What you seeWhat to do
Your capability needs no code at allIt does not meet the bar: it is configuration. Choose another, or add the outside system the need really involves.
Your register passes thirty linesYou are designing a product, not a module. Keep the lines the brief names; move the rest to a “later” list.
An acceptance criterion says “works well”Rewrite it as something a person does and sees: “Huda dispatches a visit in under a minute and Maya sees it on her phone”.
You cannot choose an extension pointGo back to the extension map’s first question: can configuration or a documented point meet the need? Start from the lightest that can.

✳ Discussion (10 min) — The scoping clinic

Section titled “✳ Discussion (10 min) — The scoping clinic”

The prompt. (1) Which line of your plan carries the most risk of not being finished, and what will you cut first if it runs late? (2) Which of your three decision records would a reviewer most likely challenge?

With a facilitator: each learner presents their capability and plan in two minutes; the facilitator and one peer ask the two prompts; the facilitator signs off the plan or names the one change that is needed.

On your own: answer both prompts in writing, then compare your answers with the worked examples in the model answer and adjust your plan.

Model answer

Three plans, judged against the checklist.

  • Accepted. “Travel-time dispatch: the routing stub is called when a visit moves to Dispatched; the estimate is stored on the visit and shown on the dispatcher’s board; dispatchers can switch estimates on or off per visit type, and set a maximum travel time above which the board highlights the visit.” Real need, one outside system, two things a builder configures, and it fits.
  • Accepted after a cut. “Supplier risk scores with a review workflow, a supplier portal and a monthly report.” The portal and the report are a second project; cut them. The nightly feed, the review below a builder-set threshold, and the score on the supplier’s screen remain.
  • Rejected. “Photo evidence: technicians attach a photo before sign-off.” Without the outside check it is a required image field: configuration, not a capability. Adding the image service’s verdict, and a builder-configured list of visit types that need it, makes it meet the bar.

Prompt 1, a good answer: “The mobile screens for technicians are the riskiest; if they run late I keep the list and the form on the phone and drop the map view, because the acceptance criteria need only the first two.” Prompt 2: the decision a reviewer challenges most is usually the extension point; make sure its record names the lighter option you rejected and the reason.

✓ Practice (5 min) — Scoping judgement

Section titled “✓ Practice (5 min) — Scoping judgement”
PracticeChoose one answer.

A learner’s requirement reads: “The dispatcher board should be user-friendly.” What is wrong with it as a register line?

  1. Explanation for A

    ✗ Incorrect

    Not this one: a tier is one of four parts; the deeper problem is that nobody could pass or fail it. See your tasks.

  2. Explanation for B

    ✓ Correct

    Correct: an acceptance criterion says what a person does and sees, so someone else can test it. See the self-scoping checklist.

  3. Explanation for C

    ✗ Incorrect

    Not this one: the dispatcher does own the board; ownership is not what makes the line unusable. See your tasks.

Check your answer

The correct answer is B. Open the explanation under each option to see why.

PracticeChoose one answer.

For the photo evidence capability, a learner plans a new engine-level image field type, although the image service’s verdict could be stored by a Function in an ordinary field. On the extension strand, what does the checklist say?

  1. Explanation for A

    ✓ Correct

    Correct: the lightest point that can meet the need is the right one; an engine change here adds cost with no gain. See the self-scoping checklist.

  2. Explanation for B

    ✗ Incorrect

    Not this one: depth adds upgrade cost and ownership; it is justified only when lighter points cannot meet the need. See M8-S1: when an engine change is justified.

  3. Explanation for C

    ✗ Incorrect

    Not this one: images are an existing field type; the verdict can be stored with documented points. See the extension map.

Check your answer

The correct answer is A. Open the explanation under each option to see why.

PracticeChoose one answer.

Your Field Service design adds a relation field on Service Visits that points straight at Spare Parts in Asset Maintenance, so technicians can pick parts. Which checklist item does it fail, and what is the usual fix?

  1. Explanation for A

    ✗ Incorrect

    Not this one: a relation between modules is not a door with a credential; it is a coupling between modules. See the self-scoping checklist.

  2. Explanation for B

    ✗ Incorrect

    Not this one: the program’s standard asks for declared seams, so that each module can change and ship alone. See the self-scoping checklist.

  3. Explanation for C

    ✓ Correct

    Correct: a declared seam keeps Field Service from depending on Asset Maintenance’s internal design. See the self-scoping checklist.

Check your answer

The correct answer is C. Open the explanation under each option to see why.

PracticeChoose one answer.

Halfway through M11-S2 you realise your plan cannot be finished. What does a master do?

  1. Explanation for A

    ✗ Incorrect

    Not this one: half-built lines fail their acceptance criteria; the rubric rewards finished, proven scope. See the scoping clinic.

  2. Explanation for B

    ✓ Correct

    Correct: the clinic asked for this decision in advance, so the cut is deliberate and traceable. See the scoping clinic.

  3. Explanation for C

    ✗ Incorrect

    Not this one: shipping and operations are rubric rows of their own; borrowing their time moves the failure, it does not remove it. See your tasks.

Check your answer

The correct answer is B. Open the explanation under each option to see why.

You have a capability specification, a Field Service register that someone else could test against, an architecture outline with three decision records, the first two steps of a threat model, an operations outline and a plan with checkpoints, checked against the self-scoping checklist or signed off. Every later capstone session builds from these.

Next. In M11-S2 you build the Field Service module against your register, then run its acceptance as the people who will use it.