M1-S1 — Take over the Larkspur program: map the suite and its risks
Section titled “M1-S1 — Take over the Larkspur program: map the suite and its risks”| Module | M1 — Lead the enterprise program |
| After this session you can | Inventory a running multi-module suite from the designer and the API, and turn what you find into a risk register a sponsor can act on. |
| Time | Facilitated: 68 min · On your own: 68 min |
| Before you start | M0-S2: Larkspur Dev reachable as Rami Aziz, the workbench token set in your terminal (workbench). ACE’s architecture scorecard open in another tab. |
| Go deeper | Modules · Module API · The dependency graph |
◆ Orientation (1 min) — Look before you touch
Section titled “◆ Orientation (1 min) — Look before you touch”A new owner’s first instinct is to fix the first problem they see. Resist it. You do not yet know which problems matter, which are deliberate, and which “fix” would break something three modules away. Your first job on Larkspur is to know what you have: what runs, who owns it, how the parts depend on each other, and what could go wrong. That knowledge, written down as an inventory and a risk register, is what lets you answer Leila Amari’s questions from M0-S1 with evidence.
In ACE you designed a suite and judged a design with the architecture scorecard. Here the suite already exists, was built by four teams, and is in production. The scorecard still applies, but it answers “is this design good?”. A program review also asks “who answers for it, how does it change, and what will hurt us next?”.
▤ Concept (13 min) — A suite is a program when it has many owners
Section titled “▤ Concept (13 min) — A suite is a program when it has many owners”From an application to a program
Section titled “From an application to a program”An application is something one team builds and ships. A program is a set of applications that share data, people and a platform, built and changed by several teams on different schedules. Larkspur crossed that line when its second module started reading the first module’s suppliers. From then on, a change in one module could break another, and no single team could see the whole.
Program governance is the set of agreements that keeps such a program working: who owns each module, how a change travels from an idea to production, which seams are shared and who may change them, how platform upgrades are scheduled against the modules’ own releases, and how decisions are recorded so the next owner understands them. You design those agreements in M1-S2. You cannot design them well until you know what the program is, and that is this session.
The seven dimensions of an inventory
Section titled “The seven dimensions of an inventory”An inventory that helps you govern answers seven questions. Each has a place in the product where the answer lives, and most have an API that returns it in a form you can keep.
| Dimension | The question | Where you find it |
|---|---|---|
| Modules and owners | What modules exist, and who answers for each? | Administration › Applications › Modules; each module’s description and its Permissions tab; GET /api/v1/data-module |
| Seams | Where does one module read or write another’s data? | Proxy (virtual) entities, mapped fields and shared lists in each module; the dependency graph |
| Chains | Which automation in one module causes work in another? | Each entity’s Reactions; run counts in Administration › Monitoring › Reaction Logs |
| Schedules | What runs on a timer, when, and as whom? | Time-based reactions and time limits on workflow steps |
| Integrations | Which programs call in, and which outside systems are called out to? | Application users in Administration › Organization › Users; outbound calls and webhooks in reactions; Functions |
| Versions | What was installed from which package version, and what was built by hand? | Administration › Packages › Installed |
| Access to change | Who can change each module’s design? | Each module’s Permissions tab; Administration › Access Management |
The seams deserve a closer look, because they are where programs break. In ACE you chose seams deliberately: a proxy entity that shows another module’s records, a mapped field that copies a value, an announced event, a shared list (ACE M1-S2). In a suite you inherit, you do not know which seams exist until you look. The platform knows, because it keeps a dependency graph: for every resource it records what that resource depends on. The graph’s service answers one question that is exactly a program owner’s question: what outside this module depends on something inside it?
curl -s -H "x-app-token: $TOKEN" \ "$BASE/api/dependency/v1/external-dependents/DataModule/<module id>" | jqThe answer lists each outside resource that refers into the module, with its type (an entity, a view, a reaction), its name and the module it belongs to. It is the same list the designer shows when you try to delete a module that something else still uses. An empty answer means the module can change on its own schedule; a long one means its owner must ask before changing anything those resources rely on.
flowchart LR SM["Supplier Management<br/>Suppliers"] PR["Procurement<br/>Approved Suppliers (proxy)"] QC["Quality and Compliance<br/>Audited Suppliers (proxy),<br/>Supplier Scorecard"] AM["Asset Maintenance<br/>Work Orders, Spare Parts"] PR -->|"reads suppliers"| SM QC -->|"reads suppliers,<br/>writes the rating"| SM AM -->|"spare parts name<br/>their supplier"| PR OC["Operations Command page"] --> PR OC --> AM OC --> QC
What to notice: Supplier Management is read by everything and reads nothing. That makes it the program’s most shared module, and the one whose changes need the most care. The arrow that writes back into it, from Quality, is the one to examine first.
Reading the dependency graph’s answer
Section titled “Reading the dependency graph’s answer”Each item in the answer is an edge: a record that one resource refers to another. Four of its fields matter for a program review.
| Field | What it says | Why it matters to you |
|---|---|---|
from | The resource that holds the reference: its type (for example DataEntity, DataView, DataReaction), id and normalizedName | The thing that breaks if the target changes |
to | The resource being referred to, inside the module you asked about | The thing its owner can no longer change alone |
kind | MEMBERSHIP (the source belongs to the target, as an entity belongs to its module) or REFERENCE (the source points at an independent resource) | Across modules you expect REFERENCE; a cross-module membership is a design error |
hard | true if the source cannot work without the target | A hard dependent blocks deleting the target and fails loudly; a soft one is quietly emptied when the target is missing, which is worse, because nothing reports it |
The graph is kept current by the platform itself: whenever a definition changes, the dependency service re-reads it and updates its edges. It records the references it can find in definitions, such as a view’s source entity, a reaction’s target, a proxy’s base entity. It does not see a value that a Function computes or an address a reaction builds from a formula, so treat an empty answer as “no declared dependents”, and confirm with the reactions and run logs before you call a module free.
How sure, how bad
Section titled “How sure, how bad”Likelihood and impact are judgements, but a program needs everyone to judge on the same scale, or two reviewers’ “high” mean different things. Use these until the program agrees its own.
| Rating | Likelihood: in the next six months | Impact: if it happens |
|---|---|---|
| High | Expected; a change that would trigger it is already planned or requested | Work stops for a team, data is wrong where a decision depends on it, or a credential could be misused |
| Medium | Plausible; it needs an ordinary change nobody has planned yet | Work is delayed or done by hand for a while; the problem is visible and recoverable |
| Low | Unlikely without an unusual change | A nuisance, noticed and fixed within a day |
A risk’s place in the register follows from the two together: rank high-impact rows first, and within them the more likely first. A low-likelihood, high-impact row still belongs near the top when the impact cannot be undone, such as data lost or sent outside the company.
Three families of risk
Section titled “Three families of risk”What you find in an inventory falls into three families. Naming the family tells you who must act.
- Coupling risks: a change in one module breaks another. A reaction in Quality writes the supplier’s rating through its proxy; if Supplier Management renames or retypes the rating field, Quality’s chain fails, and it fails in a run log nobody in Supplier Management reads. Coupling risks are fixed by rules about shared seams and by testing changes against their dependents.
- Ownership risks: something important has nobody who answers for it. A module with no named owner; an application user whose purpose nobody remembers; three people from three teams who can all change the same module’s design. Ownership risks are fixed by naming owners, not by technology.
- Upgrade and change risks: the program cannot change safely. A module built by hand and never packaged cannot be promoted reproducibly; a scheduled job that runs as the system executor hides who caused its changes; a package installed at an old version may conflict with the next platform release. These are fixed by the release and promotion practice you set up in M1-S2 and the upgrade plan in M9-S2.
Security findings appear too (a credential that can do far more than its job needs). Record them in the same register; you will learn to rank them properly in M5-S4.
The risk register
Section titled “The risk register”A risk register is a table a sponsor can act on. Each risk is one row, and each row answers six questions. Leila Amari does not need to know what a proxy entity is; she needs to know what could happen, how sure you are, how bad it would be, who should act and what you propose.
| Column | What to write | Example |
|---|---|---|
| Id and title | A short name a meeting can refer to | R-03 Quality writes supplier ratings |
| Family | Coupling, ownership, upgrade and change, or security | Coupling |
| Evidence | What you saw, where: a screen path, an API answer, a run log | Quality’s reaction Update supplier rating updates Audited Suppliers › Rating; external-dependents of Supplier Management lists it |
| Likelihood and impact | High, medium or low each, with one sentence of reasoning | Medium: the field is stable today. High impact: ratings stop updating with no error a user sees |
| Owner | One named person who will act | Tariq Saleh, with the Supplier Management owner |
| Response | What you propose, and by when | Make the rating a declared shared field; changes need both owners’ sign-off (M1-S2) |
The evidence column is what separates a master’s register from a list of worries. A risk with no evidence is a hypothesis: write it down, but mark it so, and go and look.
▶ Guided demo (11 min) — Inventory one module: Asset Maintenance
Section titled “▶ Guided demo (11 min) — Inventory one module: Asset Maintenance”You inventory Asset Maintenance along the seven dimensions; in the lab you do the other three modules. Signed in to Larkspur Dev as Rami Aziz, with your terminal set up as in the workbench.
-
Open Administration › Applications › Modules and open Asset Maintenance. Read its description: Owner: Maintenance Engineering (Omar Haddad). On its Permissions tab, note who holds Developer or Edit.
Screenshot pending The Asset Maintenance module in the designer, with its description naming the owning team and its Permissions tab What to notice: the owner is written in the module’s description, by convention. The platform has no “owner” field, which is why a program has to agree where owners are recorded.
-
In your terminal, list the modules and their ids, then ask the dependency graph what outside depends on Asset Maintenance:
Terminal window curl -s -H "x-app-token: $TOKEN" "$BASE/api/v1/data-module" \| jq '.result[] | {id, normalizedName, description: .description.en}'AM=<the id of asset_maintenance>curl -s -H "x-app-token: $TOKEN" "$BASE/api/dependency/v1/external-dependents/DataModule/$AM" | jqThe answer names the Operations Command page’s widgets: only the page reads into Asset Maintenance.
-
Open the module’s entities. Work Orders has a mapped field, Asset Title, that copies the asset’s title; Spare Parts has a reference to Approved Suppliers, a proxy owned by Procurement. That second one is a seam going out of Asset Maintenance: it depends on Procurement, which depends on Supplier Management.
-
Open Maintenance Plans › Reactions. Raise preventive work orders is time-based: it runs daily at 06:00 and its executor is System. Write down both facts; the second is a risk.
-
Open Work Orders › Workflows. The step Planned has a time limit of 48 working hours.
-
Open Administration › Packages › Installed. larkspur-asset-maintenance is installed at 1.4.0.
Screenshot pending The Installed packages list in Larkspur Dev, showing the Larkspur packages and their installed versions What to notice: three of the four modules appear here with a version. The module that does not appear was built by hand in production.
The inventory for this module fits in four lines: owner named; one outbound seam (spare parts to Approved Suppliers) and one inbound reader (the page); one nightly job running as System; packaged at 1.4.0. One risk so far: the job’s executor.
✓ Practice (4 min) — Read the inventory
Section titled “✓ Practice (4 min) — Read the inventory”The external-dependents answer for Supplier Management lists six resources in Procurement and Quality and Compliance. What does that tell the program owner?
Check your answer
The correct answer is B. Open the explanation under each option to see why.
Quality and Compliance does not appear under Installed packages, but it runs in production. Which risk family does that belong to, and why?
Check your answer
The correct answer is C. Open the explanation under each option to see why.
Which register row is ready to give to the sponsor?
Check your answer
The correct answer is A. Open the explanation under each option to see why.
⛏ Lab (29 min) — Inventory Larkspur and write its risk register
Section titled “⛏ Lab (29 min) — Inventory Larkspur and write its risk register”Goal. A one-page inventory of the four Larkspur modules along the seven dimensions, a seam map, and a risk register of at least six evidenced risks covering coupling, ownership and upgrade.
Before you start. Larkspur Dev as Rami Aziz; your terminal with BASE and TOKEN set for
Larkspur Dev; a document larkspur-program.md with three headings: Inventory, Seam map,
Risk register. Your demo notes for Asset Maintenance go under Inventory.
Inventory the remaining modules
- Get the ids of all four modules and save the answer:
curl -s -H "x-app-token: $TOKEN" "$BASE/api/v1/data-module" | jq '.result[] | {id, normalizedName, description: .description.en}' > modules.json. - For Supplier Management, Procurement and Quality and Compliance, read the owner from the description (or record that there is none) and, on each module’s Permissions tab, who holds Developer or Edit.
- For each of the three, ask the dependency graph what outside depends on it (as in demo step 2) and
save each answer as
dependents-<module>.json. - Open each module’s entities and list every proxy entity, mapped field and reference into another module, with the direction: who reads whom, and who writes.
- Open each entity’s Reactions. List every reaction that is time-based, every one whose actions change records in another module, and every one that calls an outside address. Note the executor of each.
- In Administration › Monitoring › Reaction Logs, find the busiest cross-module reaction of the last seven days and note its run count and failures.
- Open Administration › Organization › Users and list the application users, with what each can reach (its grants under Administration › Access Management) and its expiry date.
- Open Administration › Packages › Installed and record each module’s package and version, or “built by hand”.
Map and assess
- Under Seam map, draw the modules and the seams between them, with an arrow for each read or write (a sketch, a Mermaid diagram or a photo of paper). Mark the arrows that write into a module the writer does not own.
- Score the suite against ACE’s architecture scorecard sections Modules, seams and names and Automation. Every No is a candidate risk.
- Write the risk register: at least six rows in the format from the Concept, at least one in each of the coupling, ownership, and upgrade and change families. Every row’s evidence names a screen path, an API answer you saved, or a run log.
- Rank the rows with the scales from the Concept: put the two you would raise with Leila Amari this week at the top, and write one sentence each saying why those two.
- Under the register, write the sponsor’s summary: at most five sentences, no platform terms, saying what the program is, its two most urgent risks and what you propose.
Check.
- The inventory covers all four modules on all seven dimensions (a “none” counts as an answer).
- You saved the module list and three dependents answers as files.
- The seam map shows every proxy, mapped field and cross-module reaction you found, and marks the write into Supplier Management.
- The register has at least six rows, covering coupling, ownership, and upgrade and change.
- Every row has evidence you can show, a likelihood and an impact with reasoning, one named owner and a response.
- Your top two are justified in a sentence each.
- The sponsor’s summary is five sentences or fewer and uses no platform terms.
Pass condition. All seven checks hold, and the register includes the three risks a reviewer would find first: the cross-module write of the supplier rating, the unowned ERP credential, and the module that was never packaged.
If something goes wrong
| What you see | What to do |
|---|---|
external-dependents answers 403 | The workbench user may not read the graph in your environment. Use the designer instead: on the module’s page, the delete dialog lists the same dependents. Cancel the dialog; never confirm it. |
external-dependents answers 404 | The id is not a module’s id. Copy it again from modules.json. |
| A module’s Permissions tab is empty | Its access is granted at system level only. Read Administration › Access Management for who holds Developer or Edit there. |
| No reaction runs in Reaction Logs | The seed’s history may be younger than seven days; widen the date range or note “no runs yet” as an answer. |
| You found more than ten risks | Good. Keep them all in the register, but rank them; a sponsor reads the top of the list. |
Model answer
Inventory, in brief.
| Module | Owner | Seams | Chains and schedules | Integrations | Version |
|---|---|---|---|---|---|
| Supplier Management | Procurement Systems team, no person named; Developer held by three people from three teams | Read by Procurement (Approved Suppliers) and Quality (Audited Suppliers); written by Quality (Rating) | None of its own | None | 1.2.0 |
| Procurement | Procurement (Sara Qasim) | Reads Supplier Management through Approved Suppliers; read by Asset Maintenance (Spare Parts) | Purchase Request workflow with a Technical Review sub-workflow; reaction Send approved order to ERP calls an outside address | Legacy ERP Sync (Edit on Procurement, no expiry, purpose unknown); outbound call to the ERP | 2.0.1 |
| Asset Maintenance | Maintenance Engineering (Omar Haddad) | Reads Approved Suppliers; read by the page | Daily job at 06:00 as System; 48-hour limit on Planned | None | 1.4.0 |
| Quality and Compliance | No description | Reads and writes Suppliers through Audited Suppliers; Supplier Scorecard aggregates Non-conformances by supplier | Update supplier rating when a non-conformance closes | None | Built by hand |
Register (the reviewer’s first findings, ranked).
| Id | Risk | Family | Evidence | L / I | Owner | Response |
|---|---|---|---|---|---|---|
| R-01 | Quality writes supplier ratings into a module it does not own | Coupling | Update supplier rating updates Rating through Audited Suppliers; external-dependents of Supplier Management lists it | M / H | Tariq Saleh with the Supplier Management owner | Declare Rating a shared field; changes need both owners (M1-S2) |
| R-02 | Unowned ERP credential with Edit on Procurement | Ownership (and security) | Legacy ERP Sync: Edit on Procurement, no expiry, no description | M / H | Sara Qasim | Confirm its use within two weeks; give it a view-only door or remove it |
| R-03 | Quality was never packaged | Upgrade and change | Absent from Installed; no package in any environment | H / M | Tariq Saleh | Export it as a package from production before any change (M1-S2) |
| R-04 | Supplier Management has no single owner | Ownership | Description names a team, not a person; Developer held by three teams | H / M | Leila Amari to appoint | Name one owner; others lose Developer |
| R-05 | Nightly job runs as System | Upgrade and change | Raise preventive work orders: executor System | M / M | Omar Haddad | Run it as a named application user so its changes are attributable |
| R-06 | Spare parts depend on Procurement’s proxy | Coupling | Spare Parts references Approved Suppliers | L / M | Omar Haddad with Sara Qasim | List it as a declared seam; test Procurement releases against it |
The top two: R-01, because a renamed field would silently stop ratings and the scorecard the quality team reports from; and R-02, because a forgotten credential with Edit on purchasing is the cheapest risk to remove and the most expensive to leave. Your register may word things differently and add more rows; it passes if it holds these first three and meets the checklist.
Sponsor’s summary (example). The Larkspur suite is four connected applications run by four teams, and the supplier list at its centre is used by all of them. The most urgent risk is that the quality team’s automation changes supplier ratings in a part of the system it does not own, so a routine change there could silently stop the ratings. The second is an old access key with wide rights over purchasing that nobody can explain. I propose to name an owner for each application, agree who may change the shared supplier data, and retire or narrow the old key within two weeks.
◇ Worked scenario (4 min) — The rename that would have broken the scorecard
Section titled “◇ Worked scenario (4 min) — The rename that would have broken the scorecard”Two weeks into your ownership, the Supplier Management team asks to rename the supplier field Category to Supplier Type and to split Seals into Static seals and Dynamic seals. They say it is “only a label change in our own module”. Follow the reasoning, deciding at each point before you read on.
Decision 1: is it only their module’s business?
You run external-dependents for Supplier Management and look at what refers to the category. Three things do: Procurement’s Approved Suppliers proxy shows it; Quality’s Supplier Scorecard groups by it; and the non-conformance workflow’s owner rule routes each case to a quality engineer by supplier category. So no: three other resources in two other modules rely on it.
Decision 2: which part of the change is dangerous?
The label is not. A label is what people read; the other modules bind to the field’s normalized
name, category, and to its values. Renaming the label to Supplier Type while keeping the
normalized name changes nothing for them. Splitting the value Seals is different: every
non-conformance owner rule that says “Seals → Tariq’s seals specialist” stops matching, and the
scorecard’s history splits into a category that no longer exists and two new ones. That is the
coupling risk, and it is in the values, not the label.
Decision 3: what do you do?
You do not refuse. You register the risk (coupling; evidence: the three dependents; likelihood high, because the change is requested; impact high, because non-conformances would route to nobody), and you set conditions: keep the normalized name; add the two new values without removing Seals until Quality’s owner rule and the scorecard have been updated and tested in Larkspur Lab; then retire Seals in a second release. You ask Tariq Saleh, the owner of the affected module, to agree the plan.
Decision 4: how do you know the plan works?
A plan agreed in a meeting is still a hypothesis. You ask the Supplier Management team for their change as a package version, import it into Larkspur Lab, and run the three dependents there: open a non-conformance against a supplier in each new category and check who owns it; open the scorecard and check that both new categories appear; open a purchase request and check the supplier picker still shows the category. Each check takes minutes, and each one passing is a line of evidence in the change record. If one fails, it failed in the lab, not in front of Tariq’s team.
Decision 5: what do you tell the sponsor?
Leila Amari does not need the details. She gets three sentences: the Supplier Management team’s change is approved; it ships in two steps a week apart, because Quality’s routing and scorecard depend on it; nothing changes for her teams in the meantime.
The outcome. The change ships a week later than requested and nothing breaks. The lasting result is a rule for M1-S2: a shared seam’s normalized names and values change only with the agreement of every module that depends on them. A master’s value here was not knowing the answer; it was knowing where to look and what to protect.
✓ Practice (5 min) — Judge the program
Section titled “✓ Practice (5 min) — Judge the program”A team wants to change the label of a field that two other modules read through a proxy. The normalized name and the values stay the same. What is the risk to the other modules?
Check your answer
The correct answer is B. Open the explanation under each option to see why.
Which finding is an ownership risk rather than a coupling risk?
Check your answer
The correct answer is C. Open the explanation under each option to see why.
You suspect that a reaction somewhere writes into Asset Maintenance, but the external-dependents answer for Asset Maintenance lists only the Operations Command page. What is the best next step?
Check your answer
The correct answer is A. Open the explanation under each option to see why.
Leila Amari asks why you want Quality and Compliance exported as a package before anyone changes it. Which answer gives her the reason?
Check your answer
The correct answer is B. Open the explanation under each option to see why.
↺ Recap (1 min) — You know what you own
Section titled “↺ Recap (1 min) — You know what you own”You can now inventory a running suite along seven dimensions, find its seams through the dependency graph and the designer, and turn the findings into a register a sponsor can act on: evidence, likelihood and impact, a named owner and a response for each risk.
Next. M1-S2 turns the register’s responses into the program’s governance: owners, environments, the promotion path, the release train and the decision records that stop R-01 to R-06 from coming back.